Oct 20 – 22, 2026
IBS Science Culture Center, Daejeon, Korea
Asia/Seoul timezone

Session

Session 1. Source terms, new accelerator facilities and related topics

Oct 20, 2026, 9:20 AM
IBS Science Culture Center, Daejeon, Korea

IBS Science Culture Center, Daejeon, Korea

Expo-ro, 55, Yuseong District, Daejeon, Korea

Conveners

Session 1. Source terms, new accelerator facilities and related topics: Session 1. Source terms, new accelerator facilities and related topics

  • Nam-Suk Jung (Pohang Accelerator Laboratory / POSTECH)

Presentation materials

There are no materials yet.

  1. INSEOK HONG (IBS)
    10/20/26, 9:20 AM
    Oral

    The heavy ion accelerator consists of an ISOL and an IF system, where the ISOL produces rare isotopes using a 70 MeV proton beam and is configured so that they can be re-accelerated by the IF system. In the IF system, for the stable isotope U-238, the maximum beam energy is 200 MeV/u. Currently, a cyclotron-based ISOL system and a low-energy superconducting accelerator are in operation, and...

    Go to contribution page
  2. Juan Zamora (Facility for Rare Isotope Beams)
    10/20/26, 9:40 AM
    Oral

    The Facility for Rare Isotope Beams (FRIB) serves as the world’s most powerful heavy-ion accelerator. Currently operating at 20 kW, plans are underway to increase beam power by a factor of 20.
    In operation since 2022, FRIB produces rare-isotope beams through in-flight fragmentation of high-power beams of stable heavy-ion isotopes ranging from oxygen to uranium at energies up to 200 MeV per...

    Go to contribution page
  3. Leila Mokhtari Oranj (DESY)
    10/20/26, 10:00 AM
    Oral

    In recent years, a new fourth generation of light sources has emerged based on advanced storage-ring lattice concepts. This new approach enables a significant reduction in horizontal emittance compared with existing facilities. PETRA III at DESY is one of the brightest synchrotron radiation sources worldwide, serving a broad international and multidisciplinary user community through 25...

    Go to contribution page
  4. Stefania Trovati (Lawrence Berkeley National Laboratory)
    10/20/26, 10:35 AM
    Oral

    The Advanced Light Source Upgrade (ALS‑U) project at the Lawrence Berkeley National Laboratory (LBNL) requires a comprehensive evaluation of a swap‑out incident, defined as an errant electron beam being injected into a photon beamline and subsequently lost, resulting in potentially unacceptable radiation dose levels on the experimental floor. Historically, for the currently operated ALS...

    Go to contribution page
  5. Jan Blaha (SLAC National Accelerator Laboratory)
    10/20/26, 10:55 AM
    Oral

    The Linac Coherent Light Source II High-Energy (LCLS-II-HE) upgrade at SLAC extends the superconducting radiofrequency linac from a nominal beam energy of 4 GeV to 8 GeV, doubling available beam power to approximately 240 kW and enabling expanded free-electron laser capability. The higher beam energy produces harder and more forward-peaked electromagnetic showers, which can elevate dose rates...

    Go to contribution page
  6. Thomas Frosio (SLAC)
    10/20/26, 11:15 AM
    Oral

    The Linac Coherent Light Source II (LCLS-II) at SLAC is a continuous-wave (CW) superconducting radiofrequency (SCRF) electron linac that accelerates electrons to about 4 GeV at MHz repetition rates, with a design beam power of 120 kW and a maximum credible beam power of 1.2 MW. Radiological commissioning advanced through staged beam destinations: halo collimators along the linac, the Beam...

    Go to contribution page
  7. 10/20/26, 11:35 AM
Building timetable...